SAN PEDRO WATERFRONT ENHANCEMENTS: SOUTHERN PACIFIC SLIP
- Client: Port of Los Angeles
- GC: Sully Miller/ John S. Meeks
- Location: San Pedro, CA
Success Story – G&F’s unique diamond wire saw capability and our expertise in the demolition of piers and pile caps cemented our role in this challenging waterfront project. In addition to wire saw cuts of 66″ x 44″ thick and 60″ diameter flat saw cuts on the pier deck, we designed innovative slurry water and debris control solutions to prevent waste from entering the waterway.